TOOL GUIDE · EPISODE 3Calculation Tools

An Air Handler in Winter: Air Mixing and Heating

In winter, cold fresh air mixes with return air in an air handling unit, and the mix is then heated in the heating coil. This episode calculates both steps in turn with the air mixing and heating coil tools, showing mixing by mass, the heating capacity, the hot water flow and why relative humidity falls when air is heated.

Published: 13 October 2026Narration: Turkish and English2:56

In this video

  • When 2,000 m³/h of fresh air (0 °C, 80%, 3.03 g/kg) mixes with 8,000 m³/h of return air (22 °C, 40%, 6.59 g/kg), the mix comes out at 17.31 °C and 5.83 g/kg.
  • The tool weights the streams by mass, not by volume; the cold, dense fresh air makes up 21% of the total mass. On the chart the mixing point lies on the line joining the two streams, closer to the return air.
  • Heating the mix to 30 °C at 10,000 m³/h needs 42.98 kW; with a hot water heater this means a water flow of 1.85 m³/h.
  • Heating adds no water to the air: the humidity ratio stays the same while relative humidity falls to 21.9%, and on the chart the process is a horizontal line.
  • When relative humidity drops below 30%, the tool recommends adding a humidification stage after the coil; the amount of moisture to add is found with the humidification load calculation.

Related

More from this series

More videos

Dehumidification in Plastics Production4:46
Academy Series · Ep. 24
Dehumidification in Plastics Production

In plastics production, moisture does harm in two ways: moisture inside the granules causes defects and hydrolysis during processing, and moisture in the room air condenses on the cold mould surface and causes mould sweating. This episode covers hygroscopic and non-hygroscopic plastics, processing moisture limits, moisture regain in granules, mould sweating with a worked dew point example, why warming the cooling water is not a lasting fix, the lasting fix with dry air, technology choice and capacity sizing.

Plastics Production · 13 October 2026
Dehumidification in Cooling Tunnels4:41
Academy Series · Ep. 23
Dehumidification in Cooling Tunnels

In chocolate and confectionery production, gloss is often lost at the end of the cooling tunnel. If the cold product surface is below the dew point of the tunnel air or the room air at the exit, moisture condenses on it and sugar bloom begins. This episode covers where condensation begins, why relative humidity can mislead, dew point targets by product, the buffer zone at the exit, infiltration, a worked moisture load and dry-air flow, and choosing the right dehumidification technology.

Chocolate & Confectionery · 13 October 2026
Why Cylinder Life Shortens in Electrode Humidifiers4:52
Academy Series · Ep. 22
Why Cylinder Life Shortens in Electrode Humidifiers

The same electrode steam humidifier can give very different cylinder life on two sites: on one the cylinder lasts a long time, on the other it is replaced far more often. The difference comes from the feed water and how the unit is operated. This episode covers how minerals build up in the cylinder as steam is produced, how scale coats the electrodes, the conductivity band, the drain balance, foaming, water treatment choices and the effect of the operating profile on life, and compare them with resistive humidifiers that have a cleanable steam tank.

Humidification & Water Quality · 13 October 2026